Thursday, December 23, 2010

How Aceptable Is Masterbation

THE ISLANDS OF THE PARANA DELTA ARE SAILING And inform us


ESTIMATED ASSEMBLY Islanders RIO DE LA PLATA BASIN INTERNATIONAL : I went sailing off the USURPER COLONY PARK SA the 21/12/1910, where the ship is Goyzeco dredge the canal dredging International Linking and San Antonio, but apparently does not work, nor backhoes and also is not personal on the coast, ducts and pipes that carry refulado out of the dredge and floating among the reeds, climbing to the cost of a property is not removed and lost in the interior of the island.
not visible from the water where the pipe ends, but I can add that no visible warnings moorings or be a hazard to navigation should discard them, by strong current, waves or wind, I bring some photos, which I believe testing will serve as my testimony and those who accompany me, you see very little of the pipeline, nor warned seals, or the presence of the PNA of San Isidro guarding the place, as on other occasions, as happened to my back on 23/12 morning. At night now I hear, as in other previous occasions, the sound of the engines of the machinery at work, despite the preventive closure order ordained by Ms. Judge Sandra Arroyo Salgado, Roberto and family cordially.

The ASSEMBLY RIO DE LA PLATA BASIN INTERNATIONAL CONSIDERS TAKING SUITABLE KNOWLEDGE THE PREFECT PRINCIPAL, CHIEF OF NAVAL ARGENTINA PREFECTURE OF SAN ISIDRO, ROGER DON GUSTAVO PELLEGRINO, AS WELL AS THE DIRECTOR OF NATIONAL WATERWAYS DR. BENI JOSEPH who failed PRESENTED IN THE INSPECTION AREA December 14, TAKE EVEN KNOW THAT MRS. FEDERAL FISCAL DRA. RITA MOLINA ESTHER PURPOSES DEEMED TO APPLY.

The bed of the International Channel Bonding, the edges, sand, mud, snails and subsoil salts Querandinense aquiclude, dredging without authority, without authorization by the international, national, provincial, and municipal sight are like a corpse in the sun, behind double wooden palisade built by Colony Park SA, who ran the shore line on 40 meters usurping international public land, such as real estate and land theft in the province as chattel. How long are going to continue tolerating the alleged commission of such crimes federal public servants of the National Waterways, the Coast Guard Argentina's San Isidro, the National Secretariat of Environment and Sustainable Development of the Nation, the Provincial Agency for Sustainable Development of the Provincial Department of Mines and the U.S. Attorney's Office No. 1 San Isidro by Dr. Rita Ester Molina?

Wednesday, December 22, 2010

8 Months Pregnant And Sore Tummy

BY THEIR ACTS AND OMISSIONS IN THE NATIONAL BUREAU OF waterways and the PNA OF SAN ISIDRO

BECAUSE SINCE MID-2008 AND CURRENT AND IMMINENT SHAPED BY GROSS their illegal and arbitrary acts are injured RIGHTS AND WARRANTIES OF THE ASSEMBLY OF THE SILVER RIVER BASIN INTERNATIONAL AND FUTURE GENERATIONS.









Dr. JOSE BENI failing to comply with its duties of public officials to meet in front of the National Directorate Waterway and ignore changes in international waterways without permission and consequently, would be covering up the illegal actions of Colony Park SA, in the 1 st Section of Islands as evidenced by the picture in the modification of the Canal Link in relation to the Luján.




With this evidence, the members of the ASSEMBLY OF LA PLATA RIVER BASIN INTERNATIONAL weave, as in a lattice of reeds, the definition of crimes blamed on the board of Colony Park SA and other State officials Municipal, Provincial and National, which since mid-2008 are faced with the alleged commission of crimes against humanity against their ancestral island population by demolishing their houses on stilts and collective environmental damage in the Delta del Paraná.

Monday, December 20, 2010

Fotos De Munheres Peladas

SHIPS VERY COMMITTED TO COLONY PARK SA DREDGERS prejudice free PNA NAVIGATION AND CONTROL omit

OTHER ISLANDS ASSEMBLY MEMBERS OF RIO DE LA PLATA BASIN INTERNATIONAL , complaint and provide TESTING SPECIAL ASSEMBLY TO RAISE COMPLAINT BY THE FEDERAL PROSECUTOR OF DR. RITA ESTER MOLINA AND SAYS: "Today at the point that the dredger is Goizeko Colony Park SA, is a very dangerous place for navigation, since this is where the passage narrows before JOIN beacon at sunset waters at Logan, with the sun in the west just go and left it little room to pass, stayed a few days ago a tall ship aground, allegedly to avoid collision with the dredge in question, I take some pictures that I send, pity he did not leave the dredge, but if the ship's name "OFELIA" in situation. This dredge is currently not easy to navigate, as expressed any authority, just taking money along the coastline, at most extend it about 30 meters from where the dredging should be a ridge to ridge, at least is the operation that you look at the date of suspension of activities, "Cordially Roberto.
WITHOUT PERMISSION OF THE NATIONAL BUREAU WATERWAYS, whose officials have failed to comply with the mandate to be present at the Judicial Inspection ordered by Federal Judge Ms Sandra Arroyo Salgado, warned ISLANDS UNDER THE PLAINTIFF IN THIS CASE FEDERAL CRIMINAL.

"I also send another paradox Watersports picture of officials of the PNA of San Isidro, which prohibit anchoring in the San Antonio and almost covering the cartel wielding the readiness of the Coast Guard is currently a huge pontoon, moored and staked. "According to other islanders
Parana Mini, is known as " Pluma Pluma Gay Pontoon " does it make gay parties and all sorts? what happens, the layout is not for everyone?, what about boating safety?, islanders Assembly Cuenca Rio de la Plata International, spent browsing in the wee hours of the night, controlling the area, say they thought she saw dancing "Pluma Gay" to the Mayor Eduardo Gabriel Cutropia Principal, Principal Officer and Carles Diego Mayor Ismael José Ismael Ceballos, or perhaps were monitoring the safety of navigation.

seem, for the Assembly Cuenca Rio de la Plata International, to conceal the illegal activities of Colony Park SA is more important for the NAP of San Isidro, the safety of navigation and navigators who pay their tuition and taxes, plus the Ship cutter suction dredger had no statutory funding balls, by the time ran aground The OFELIA, no signs, shop signs or warning lights to distinguish the latter GOYZECO dredge vessel, a vessel in navigation This does not seem to bother the PNA officials of San Isidro that would to come to public trial to answer for concealment, abuse of authority, breach of the duties of public officials, breach of the law, and enforcement authority, such as custody and strategic support to the Colony Park SA. give evidence

Thursday, December 16, 2010

Things To Put In Your Shoes To Be Taller

TODAY ALL MEMBERS OF THE RIVER ASSEMBLY LA PLATA BASIN INTERNATIONAL also a plaintiff in the case "ENRIQUE C. Ferreccio YOUR COMPLAINT" AGAINST DEADLY BLOW ANOTHER

TO MRS. FEDERAL FISCAL DRA. RITA ESTHER DOMINGO MOLINA JUAN ISLANDER FILED, ROBERTO Galloro, ANTONIO LEDESMA, JUAN ANTONIO PORQUERES, ALBERTO CASTRO AND MRS. ADELA MARIA PELAYO.

As such statements PNA officials (PHOTO) together with custodians of Colony Park HS and the boat (PIC) of the company, would have scared off waiting Islanders in their properties the arrival of the judicial commission, ordering them to withdraw from them. One of the officials of the PNA would be one such Ferreyra, according to the testimony of the islanders Antonio Ledesma who was forced to withdraw from their property, "Maria Laura", the workshop of the Assembly in the river "La Paloma", where he waited to commit judicial and gave the news.

Another official of the PNA chubby and clear green eyes, told a group of islanders that they were criminals, in time of the judicial inspection in the area of \u200b\u200bArroyo Pacu in the Island Park

also reported that Ships cutter suction dredgers, still working on the night, a fact that could prove harmful, too, the public officials involved in the judicial inspection on 14 December to be advised by the islanders, which continued dredging The waters of the Pacu and Anguilla are muddy (FOTO), the sampled police officers.

(PHOTO) Here the judicial commission could see the waters of the Arroyo La Paloma bow of the boat, are more transparent than Arroyo's muddy Anguilla, in the stern of the boat. This is for the continued dredging night to break the Dredges of Colony Park, the closure order Ms. resolved by Judge Sandra Arroyo Salgado and the failure of the PNA of San Isidro in control, as ordered by this court decision. Water samples were taken from Arroyo La Paloma, with two witnesses.

And also because the dredgers, as has been found "in situ" were armed and how well they explained the islanders to the judiciary, very little knowledge of objective, cutting blades were bright, and this is produced by rubbing with sand to cut the bottom and if they had several days of stalled as the order of Mrs. Closing federal trial judge would have to be oxidized, which was not the case, the blades of dredges were bright and also had no closing tags.

Here again, note the clear waters ahead, the more murky and aft, also warns tamponade by Colony Park SA denounced long ago and now the PNA will have to operate, or remain in breach of the duties of his charge: Failure or delay of duties (art. 249) "shall be punished by a fine of [750-12000 hundred dollars] and disqualification from one month to one year, the public official who illegally omits, or refuses to delays carrying out any act of his office. " Even you could cover the typical behavior.
(PHOTO) Launch of the NAP on Arroyo Anguilla murky sludge dredging continued to December 14.
The action is to ignore, refuse to do any act or delay of the functions itself. This is a pure crime hacer.Rehusar omisión.Omitir is not doing so is to deny that this assumption is necessary to have been questioning sentido.El legitimate in a particular crime is, in delaying the act Delay is not doing its tiempo.La consummation takes place with the negligent act, without any consequence occurs.

object omission is an act of his office. This is because the ceremonies of a function, which is quite clear that copyright can only be a public official. Such as breach of the order issued by Ms. Salgado Judge Sandra Arroyo, on controlling the closure, omitted by the PNA of San Isidro.

The fact is intentional, and explicit requirement of the rule in the sense that it is a default accomplished illegally, makes a demand which is at par objective and subjective.

The cutter suction dredges, which have no books in their navigational clearance and works, permission for dredging or environmental impact study, they were closed for security seals NAP San Isidro, the As the basis of Colony Park, as warned islanders to the fledgling judicial commission and in fact, did not identify the staff of Colony Park SA, Photo dredging work.

The Assembly Cuenca Río de la Plata International ask the Attorney Ms. Rita Ester Molina, an investigation into the alleged crimes, which would be incurred by the PNA officials of San Isidro and believe should be relieved; acts committed also in cooperation and coordinate on the armed warders Colony Park SA.

Photographed in flagrante: Draga Draga Henonde Carapachay and "A" dredging despite the closure order, omitted NAP San Isidro of control, ordered by Federal Judge Ms. Sandra Arroyo Salgado.
Assembly The River Plate Basin will International reservations about the quick and speedy judicial inspection, for example to the failure of officials from the National Waterways in attending the judicial inspection, the islanders tried to demonstrate deepening illegal in 20 mt. Channel Bonding, as well as signs saying "PRIVATE CHANNEL" placed Colony Park SA illegally and had also islanders in their properties, where the judicial commission did not, by hasty to finish the operation, as the case Island "The Tigre "by Juan Domingo Submission you saw them pass, but not for finding the Islanders landed on their property destroyed by Colony Park.

Amid the International Channel Bonding, (PHOTO) wanted to demonstrate the depth more than 20 illegal m., which dredges made by Colony Park SA contracts and not controlled by the PNA of San Isidro.

But as stated in the photographic record, went by quickly, without stopping to check the meters of deepening illegal dredging when Roberto Galloro island was about to throw the anchor in a measured out.
One of the 20 wards and staff Colony Park is not identified, taking photographs of the judicial commission in the property "The Yacare" Islander Jorge Ernesto Castro. Were identified by the judiciary?

Wednesday, December 15, 2010

Lumineyes - Laser Eye Color Change

COLONY PARK SA, ISLAND PARK, ISLAND EAST, SANTA MONICA AND OTHER mega-enterprises IN THE DELTA OF PARANA

ASSEMBLY
RIO DE LA PLATA BASIN INTERNATIONAL, dealt another blow to the mega-enterprises PROPERTY AS COLONY PARK SA.

Those responsible are desperate Colony Park SA (photo) panic is reflected in their faces, yesterday Dr. EDUARDO ANTONIO Merola, attorney for the ASSOCIATION IN DEFENCE OF THE QUALITY OF LIFE , trying remedy the error made by Dr. and Mrs. Judge Caparelli by the Civil and Commercial Court No. 11 of San Isidro, was found in the car styled "ASSOCIATION IN DEFENCE OF THE QUALITY OF LIFE C / COLONY PARK SA S / REGULAR" Expte. No. 68660, and respectfully said:
1 .- Through this writing and for reasons that are developed here, my part is to account for the failure of the defendant COLONY PARK SA to the obligations it assumed in the settlement agreement and order is ordered to rebuild the property under the conditions that had become operational at the time of the injunction.

2 .- I ask that the exposed application is ordered by a declaration of pure law of those claims Once all the criticisms made here are already accredited by convincing proofs issued by the Coast Guard and the Federal Justice, as will indicate.

3 .- As shown in the accompanying documentary and other evidence to prove such compliance is offered, the defendant has violated COLONY PARK SA in a systematic and intentional, the prohibition of any new work in undertaking subject to this process, which remains in force the injunction issued in this matter dated 19.08.2009 (pages 55/55vta.) that, until it has the necessary and after EIS could not perform any work for construction of gated community that seeks to build on the Parana River delta and called COLONY PARK ISLAND, limitándosele the power to do something, only those minimal maintenance and conservation.

But did the opposite: construction continued at a point that many of them and were shaped with the central features of the project.

4 .- It is noteworthy that the agreement approved by VS while refulado authorized the completion of dredging and filling, in order to clarify the scope of the consent, expressed in the minutes of hearing held on 19/02 / 2010 "without any of these tasks means construction progress and tasks edilicias "

But COLONY PARK SA was contrary to their fundamental obligation, he spent the entire period from February 2010 to the present, to advance the substantive tasks designed to realize the venture, with total disregard for its commitments and the scope of the approval given by the agreement VS.

In other words, bet on the policy of "fait accompli", taking advantage of the lack of permanent control in space as it seeks to build a great real estate business, with total disregard for the environment.

5 .- It is significant to highlight that this action unconscionable, not only is a violation of a court order, but persists in moving forward with construction projects affecting the environment, without the prior and necessary Environmental Impact Statement required by art. 5 inc. b) and provisions cctes. provincial law and regulations 11723 and 11 cctes. 25675 national law.

6 .- In addition to this core in order to breach its main obligations, arguably COLONY PARK SA has also been sluggish and lax in their commitment to properly arrange the collection of the Environmental Impact Statement and keep the Court of progress in this regard. It arises from the simple display this cause.

Obviously this lack of progress in the process is closely linked to that if they did would face insurmountable objections to proceed in such efforts. Conclusion: the more you delay it, the better to continue specifying illegalities.
photo December 14. 2010 (Mr. Director Architect Nestor Rubén Gil of SAyDSN Conners, Daniel Martinez Architect Chief Building Colony Park SA and Mr. Custody Officer Colony Park SA desperate)
For the failure shown here makes it necessary to transform our understanding of the caution in the decommissioning NO POSSIBILITY ENDEAVOR ACCESS TO ANY PERSON IS NOT SHOWING AUTHORIZATION VS, instructing the Coast Guard Argentina to take appropriate measures to achieve compliance with that court order, informing the organized VS respect with any precision (sites control, number of staff, hours allocated, etc)
It ordered the closure of the venture, under the terms stated in Chapter IX, so that coincides with the decision in this regard by the Federal Judge Criminal and No. 1 San Isidro . Want
VS provide compliance, JUSTICE WILL

Tuesday, December 14, 2010

Belkin N150 Micro Usb Wifi Pilote Linux

DETERMINATION OF CORPUS LA 1 criminis SECTION THREE ISLANDS


the complainants (Islanders) are allowed to witness the visu inspection and evidence, they are those who know the "corpus criminis understood as the thing I have performed the acts referred to as criminal law and they are also part of it by integrating ancient civilians attacked.

The Architect Nestor Ruben Gil Conners Instruments Division for Sustainable Development, submitted by Dr. Homer Maximum Bibi of the National Secretariat of Environment and Sustainable Development of the Nation, along with Jorge Ernesto Castro Islander on their property "The Jacare" who shows him the attack on those responsible for Colony Park SA against your property and family. The Director, Architect Nestor Rubén Gil Conners, Secretariat for Environment and Sustainable Development of the Nation reassuring explanations on "Comprehensive Strategic Plan for the Conservation and Sustainable Use in the Delta del Paraná" (PIECE-DP ), which is intended as a tool for environmental planning based on objectives such as "protect, conserve and sustainably exploit the components of biological diversity and natural resources in the area" and "maintain or appropriate, restore the structure, functions and processes in general strategic ecological Paraná Delta ecosystem. "

The President of the Assembly Cuenca Río de la Plata International, the island Antonio Ledesma, explains to the Federal Police Officer Officer Candia, the aggression recently suffered by such a Ferreyra of the NAP with other companion white uniform at the launch of the Company Colony Park SA machete when he was on his property "Maria Laura" pending the Judicial Commission. Antonio Ledesma reiterate novelty on 16 before the bar of Attorney Ms. Rita Ester Molina, because the inspection did not attend court ordered his secretaries.
Antonio Ledesma demonstrates to the Secretary of the U.S. Attorney's No. 1 San Isidro, the Federal Police and the Public Officials of the Ministry of Environment and Sustainable Development of the Nation as the Cutter-suction will flood their property as they do not leave dredge, you can see the mud flooding the little plantation that still does not cut down Colony Park SA. Despite the closure still dredges dredging, incurring Colony Park SA in disobedience to the authority of art. 239 Criminal Code, as well as officials of the PNA of San Isidro, for failing to meet the decision dated November 30, 2010, by Federal Judge Ms. Sandra Arroyo Salgado, who ordered the preventive closure of facilities for entrepreneurship and ISLAND COLONY PARK ISLAND PARK TRUST ..
In desperation
Islander Antonio Ledesma for the destruction of their property, "Maria Laura", by Colony Park SA Vazquez as the witness, the officer sent by Dr. Homer Maximum BIBILONI of the Ministry of Environment and National Sustainable Development Architect Nestor Rubén Gil Conners shows him in dependencies of the Cabinet of Ministers, its owner Sergio Massa, Interior Minister Florencio RANDAZO and Secretary of Environment and Sustainable Development of the Nation Romina Picolotti , received last Thursday September 25, 2008 to the Governors of Buenos Aires, Daniel Scioli ; of Santa Fe, Hermes Binner and Entre Rios, Sergio Urribarri . The meeting discussed the issue of the Paraná Delta and reached consensus that were reflected in the Letter of Intent those officials who signed as a closure of the meeting.
That document spells out the decision to commit the best efforts of management to start the process leading to the development and implementation of a Comprehensive Strategic Plan for the Conservation and Sustainable Development of the Delta Parana.
Le continuous showing, to reassure islanders that the three provinces are working on creating an Interjurisdictional Committee for Sustainable Development of the Delta, an institutional environment of high political level at which to coordinate actions to preserve and sustainable, actions to date have become a matter of urgency noted in the area being recorded allegedly deliberate grass fires.

The Islander Juan Antonio Derganz informed the judicial committee of the Arroyo destruction Anguilla Channel Bonding, police officers Samples of water and sand, as the islanders say they are the substance of international rivers that destroys the aquifer Querandinense, sulfates and salts possessing themselves of the sea, like sea shells ground targets, which is altering the entire Delta ecosystem, freshwater adultery, just since June 2008.
The Architect Director Nestor Rubén Gil Conners, Secretary of Environment and Sustainable Development of the nation finally tries to reassure the island and told that Freplata Project began its implementation phase, expressed in the Press Release of 05/11/2010, detailing the Assistant Secretary for Environmental Policy Coordination of the national environmental portfolio, Prof. Fernando Melillo, inaugurated the Project Initiation Workshop "Reduction and Prevention of pollution from land in the Rio de la Plata and its Maritime Front through Implementation Strategic action program for Freplata. "

The Judicial Inspection delimited in a credible corpus instrumentorum " referring to the use of tools or means to facilitate the activities of the alleged crime, as well, detailing the machines are working in water (boats, barges, ships, dredges, dragline) and ground (backhoes, retroanfibias, bulldozers), therefore, saddled crime is found, it requests the MPF ordered the kidnapping of them and identify personnel for be jointly liable for the alleged environmental crimes and crimes against humanity.

The December 14, 2010 is revealed corpus probatorium ", consisting of pieces of evidence, ie, traces, tracks and traces left by the perpetrators in the commission of the crime.
WITH ALL OF THESE ITEMS THAT PROVE THE COMMISSION OF CRIMES AGAINST HUMANITY ENVIRONMENTAL DAMAGE AND COLLECTIVE, THE ASSEMBLY OF THE SILVER RIVER BASIN INTERNATIONAL IS WILLING TO TAKE ALL THOSE INVOLVED IN THE COMMISSION OF THE ALLEGED ILLEGAL (of the administration of the Municipality of Tigre, Buenos Aires, the Argentine Government, Administration of Justice PNA) TO THE INTERNATIONAL CRIMINAL COURT.